ALERTS!!!!

“The number of children and grandchildren with cancer in their bones, with leukemia in their blood, or with poison in their lungs might seem statistically small to some, in comparison with natural health hazards. But this is not a natural health hazard—and it is not a statistical issue. The loss of even one human life, or the malformation of even one baby—who may be born long after we are gone—should be of concern to us all. Our children and grandchildren are not merely statistics toward which we can be indifferent.”

John F. Kennedy, July 26th, 1963

Thursday, December 12, 2013

Fukushima: General Electric Knew Its Nuclear Reactor Design Was Unsafe … So Why Isn’t GE Getting Any Heat for Fukushima?

From: Global Research

GE Engineers and American Government Officials Warned of Dangerous Nuclear Design
5 of the 6 nuclear reactors at Fukushima are General Electric Mark 1 reactors.
GE knew decades ago that the design was faulty.
ABC News reported in 2011:
Thirty-five years ago, Dale G. Bridenbaugh and two of his colleagues at General Electric resigned from their jobs after becoming increasingly convinced that the nuclear reactor design they were reviewing — the Mark 1 — was so flawed it could lead to a devastating accident.
Questions persisted for decades about the ability of the Mark 1 to handle the immense pressures that would result if the reactor lost cooling power, and today that design is being put to the ultimate test in Japan. Five of the six reactors at the Fukushima Daiichi plant, which has been wracked since Friday’s earthquake with explosions and radiation leaks, are Mark 1s.
“The problems we identified in 1975 were that, in doing the design of the containment, they did not take into account the dynamic loads that could be experienced with a loss of coolant,” Bridenbaugh told ABC News in an interview. “The impact loads the containment would receive by this very rapid release of energy could tear the containment apart and create an uncontrolled release.” ...
...As we noted last year, the spent fuel pool at Fukushima reactor number 3 is in a heap of rubble (spent fuel pool designated as “SFP”  in the lower left):


...Postscript:  Unfortunately, there are 23 virtually-identical GE Mark 1 reactors in the U.S.
This is not to say that Tepco and the Japanese government are not to blame also.  They are.
But GE and the American government are largely responsible as well.

(FULL ARTICLE---LINK)

No comments:

Post a Comment

Thanks for your comments. In order to eliminate spam all comments are moderated. Comments will only be edited if they contain expletives or attacks on another person. All viewpoints are welcome.